Please reach us at Hello@gorillatankz.com if you cannot find an answer to your question.
We’re currently at about a 2-3 week turnaround time for pool installs. The lead time is an estimated time frame after you purchase your pool package, from when you are ready to schedule your installation to our first available time slot. You can always reach out to us if you have a reliable leveling/landscaping completion date, and we will do our best to schedule around that.
Once you place an order, you must prepare your space for delivery. We will send you an order confirmation and have you submit photos of your space when it's ready for delivery.
We will then schedule delivery, then set up your pool, a process that can take 2-4 hours. NOTE: We do not do any landscaping or digging. We are currently only delivering in the Grand Rapids area, free of charge.
We realize that everyone is designing their spaces differently so if you are working on a special project and have requests or questions on how to best prepare your space please reach out to us at Hello@GorillaTankz.com
Find a spot for your pool and make sure it’s level.
To install Gorilla Tankz, you need a solid, level surface, outdoor 110V GFCI outlet, and a clear pathway for us to roll in your tank at least 2 ft wide and at least as tall as the diameter of your pool.
You will need to get your ground professionally leveled with space at least a few inches wider than the diameter of your pool.
If you're leveling the space yourself, the best way to double check that your ground is completely level, use a level and a long straight 2x4. Put the level on top, and check from all directions. Re-level as needed ahead of time.
A Gorilla Tankz Pool Package includes:
Galvanized Steel Stock Tank details:
Copyright © 2023 New Form Pools - All Rights Reserved.
Powered by GoDaddy